For the first time in what seems forever, I've done some coding on Bungee this past week. A long-needed fix to my production/drainage/rectangle packing step in the tool has been made, though I'm still not 100% satisfied with it. Before, when the tool would produce production units that have less than the maximum number of wells, it would place pad envelopes in a way that makes it impossible to drill some of the laterals. Now, I've got some kind of fix on that. The unfortunate result of that fix is that the area where well pads can be placed is now much smaller, which of course limits how much Bungee can avoid potential impacts. Ah well, trade one thing for another!